News

Harbour Staircase

20th August 2019

Another Staircase completed here at CMD, this project was slightly more challenging as our brief was to design a...

Read More

Conveyor Structure, Access & Buildings – 62.4 Tonnes

01st May 2019

Another successful project approaches completion on site, CM Design was tasked with a project to assist in the...

Read More

Leisure Centre structure – 600 tonnes

15th April 2019

CM Design has been awarded a contract to detail a 600 tonne structure for a leisure centre.

Read More

Curved staircase – 11.4 tonnes

08th April 2019

Staircase was supplied piece small to ease installation, treads and landings have been designed to suit screed...

Read More

Stack sampling point access platform – 4.5 tonnes

01st April 2019

The existing stack and structure was damaged by fire and needed to be replaced. The existing structure was site...

Read More

Residential Staircase

19th March 2019

CM Design provides an architectural design to a residential client for approval with follow up details completed...

Read More
Page 1 of 2 Next